EV charger installation in South Florida

Most of our work starts here. South Florida homes and commercial lots share a few realities: humidity, salt air on anything mounted outdoors, HOA design rules, and building departments that expect a real permit on a dedicated 240-volt circuit. We treat those as the job, not extras.

What the houses are like

You will see 100-amp services in mid-century CBS homes, 200-amp panels in 1990s infill, and condo electrical rooms that were never designed for a row of Level 2 chargers. Each of those is a different conversation.

Who issues the permit

Miami-Dade, Broward, and Palm Beach each run their own permit portal. Typical residential EV circuit permits take a few business days when the load calculation is clean. We pull them; you should not have to chase inspectors.

How Florida EV charger permits work →

Dirt, salt, and the driveway

Coastal outdoor mounts get NEMA 3R or better hardware and stainless fasteners. Trenchless conduit under pavers and circular drives is common — that is where in-house directional drilling and missile boring pay for themselves.

Utility here: Florida Power & Light · FPL EVolution vs owning your charger

If the path crosses pavers or a circular drive, we bore it with the same crew. That is on the commercial / trenchless page, not copied onto every city.