Charging levels Level 1 Level 2 Level 3

Pricing

What a Florida Level 2 install actually costs

A short garage run on a healthy 200-amp panel is one number. A 70-foot outdoor run with a service upgrade is another. Here is how to read a quote without getting played.

For a typical South Florida or statewide suburban home — panel in the garage, charger on the same wall, permit included — labor and materials for the circuit often land between about $850 and $1,700. The wall unit is extra unless we supply it.

Panel upgrades, long homeruns, finished interiors, and trenchless crossings are the four things that move a bid. Anyone quoting a single price for “EV charger installation” without seeing the panel is guessing with your money.

What we include

  • Load calculation and written scope
  • Permit application and inspection meeting
  • Dedicated breaker, wire, and mount
  • Trenchless conduit when the surface should stay closed

If you are on FPL, ask about their EVolution Home program before you call us. It is a monthly Level 2 from the utility. It is the right answer for some garages. It is the wrong answer if you want a Tesla Wall Connector, a 48-amp circuit, or a driveway bore. FPL vs owning the charger.

Get a real number

Ballpark, not a bid

These numbers are typical Florida ranges for a Level 2 circuit plus labor and permit. The charger hardware is separate unless we supply it. A site visit still wins.

$850 – $1,400

Installed circuit, typical. Hardware extra.