EV charger installation in Orlando

Orlando is two grids in one metro. OUC inside much of the city, Duke in large stretches of Orange and Seminole. The charger work is the same. The paperwork is not.

What the houses are like

Downtown bungalows vs. Dr. Phillips and Lake Nona production homes. Completely different panel stories.

Who issues the permit

City of Orlando or Orange County. We attach the load calc and call out the utility on the application.

How Florida EV charger permits work →

Dirt, salt, and the driveway

HOA-heavy suburbs. We provide the ARC one-pager so the board does not invent a delay.

Utility here: Orlando Utilities Commission / Duke Energy (by area)

If the path crosses pavers or a circular drive, we bore it with the same crew. That is on the commercial / trenchless page, not copied onto every city.