Charging levels Level 1 Level 2 Level 3

Marion County

EV charger installation in Ocala

Ocala horse-country lots and in-town neighborhoods. Barns and extra structures are a regular part of the scope.

What the houses are like

City services vs. farm services. Detached barns need feeders and disconnects.

Who issues the permit

City of Ocala or Marion County. Utility territory is split — we check the meter.

How Florida EV charger permits work →

Dirt, salt, and the driveway

Trenchless under paddock drives. We are not cutting a farm road for a 40-amp circuit.

Utility here: Duke Energy Florida / Ocala Electric (by area)

If the path crosses pavers or a circular drive, we bore it with the same crew. That is on the commercial / trenchless page, not copied onto every city.

Assess a Ocala site

Nearby