Charging levels Level 1 Level 2 Level 3

Pinellas County

EV charger installation in St. Petersburg

St. Pete has bungalows, waterfront condos, and a downtown that is dense enough to make parking-stall conduit a design problem.

What the houses are like

Craftsman and 1950s stock often sit on smaller services. Downtown towers are association-driven.

Who issues the permit

City of St. Petersburg. Historic overlays downtown can add a review step we flag early.

How Florida EV charger permits work →

Dirt, salt, and the driveway

Salt air on the bay side. Outdoor-rated hardware, sealed penetrations, and pedestals when walls are shared.

Utility here: Duke Energy Florida

If the path crosses pavers or a circular drive, we bore it with the same crew. That is on the commercial / trenchless page, not copied onto every city.

Assess a St. Petersburg site

Nearby